Inclined construction lifts

Stros company manufactures inclined lifts of any complexity, taking into account the peculiarities of descent and finishing requirements. Each project is developed taking into account all requirements and standards.

Inclined Lifts

Stros inclined lifts can be installed anywhere, from an ordinary house to a hotel or a warehouse and a manufacturing enterprise, as well as a warehouse!

Stros lifts can be very useful in the following places:

  • Large manufacturing companies that constantly need to transport heavy materials from one floor to another.
  • Those who receive heavy mail daily and produce goods at an industrial enterprise.
  • Inclined elevators allow you to lift products up the stairs and move household items to different parts of the house.

When buying an inclined lift, it is important to note that a professional installation is required, which simplifies the process.

Inclined Lifts

Hoist ALULIFT 200 S

ALULIFT 200 S

Platform Hoist

Max. height: 19 m
Max. weight: 200 kg
Speed: 25 m/min
Open the category
Hoist ALULIFT 200 V

ALULIFT 200 V

Platform Hoist

Max. height: 60 m
Max. weight: 200 kg
Speed: 25 m/min
Open the category

Specifications

Characteristics ALULIFT 200 S ALULIFT 200 V
Delivery height max. 19 m to cornice max. 60 m
Load capacity 200 kg 200 kg
Lifting speed 25 m/min 25 m/min
Masts
Internal dimensions of the lift
Supply system 1 NPE 50 Hz 230V 1 NPE 50 Hz 230V
Drive motor power 1,5kW 1,5kW
Informations
Control voltage 24В AC 24В AC
Rated current [400V / 480V]
Starting current [400V / 480V]
Main protection [400V / 480V]
Recommended fuse protection [400V / 480V]
Plant Scherer, Georgia, USA
Industrial elevator
Scope of work: installation and commissioning of the lift HS-2000-F4, maintenance
Object:

Lifting height:
23 meters
Sutton Power Plant, North Carolina, USA
Industrial elevator
Scope of work: installation and commissioning of the lift HS-1200-F4, maintenance
Object:

Lifting height:
23 meters
Horse Mesa Dam, Arizona, USA
Industrial elevator
Scope of work: installation and commissioning of the lift HS-1000-F4, maintenance
Object:

Lifting height:
50 meters
58th Street, NY, USA
Dual mast construction hoist
Scope of work: installation and commissioning of the lift NOV 5462 F7 W TWIN, maintenance
Object:

Lifting height:
310 meters
Madison Square Garden, NY, USA
Construction hoist
Scope of work: installation and commissioning of the lift NOV 3242 UP3 F7II , maintenance
Object:

Lifting height:
160 meters
Braškov, Czech Republic
Warehouse
Scope of work: installation and commissioning of the lift NOV 600 BR, maintenance
Customer:

Lifting height:
7,5 m
Inclined Elevator from the manufacturer

You can buy Stros inclined lifts in our online store. Low prices with high quality. Our company sells goods directly from the manufacturer, so prices remain affordable. The company sells the goods in stock and under the order. Delivery throughout Nigeria. There is a pickup. If you have any questions, the company's employees are always happy to answer everything.

OUR ADVANTAGES

Flexible working conditions Individual approach to each client.
Search for solutions in non-standard situations
Professional installation We make professional installation of mast lifts
Delivery from warehouse We deliver the equipment you purchased to the facility
Availability of spare parts Main consumables and spare parts are in stock
Large equipment park Large, constantly updated range of equipment
Honest prices We offer a price without intermediary markups

Certificates and Documentation

ISO 9001
Lifting Equipment

Advantages of Stros inclined lifts:

  • Short installation time;
  • No need to install additional belt conveyors;
  • There are practically no restrictions on the characteristics of the equipment;
  • The ability to move goods without an escort;
  • Ease of operation of the device;
  • Low power consumption;
  • The overall low price of the design;
  • Operating characteristics that allow the device to be used indoors and outdoors.
GET A COMMERCIAL OFFER
We will select a lift suitable for your project, tell the timing and cost of implementation